A Qualitative Design Review (QDR) is a technique outlined in BS 7974-0 that allows the team to think of the possible ways in which a fire hazard might arise and establish a range of strategies to maintain the risk at an acceptable level.
When designers are engaged in complex designs, regardless of size, they may find it challenging to meet the obligations of Regulations relating to Fire Safety and allowing for fire fighting provisions. BS7974 advocates the use of QDR as a method to engage stakeholders in communication to mitigate risk.
The BS-9999 [1] t [2] fire can be challenged with other fire test data from studies relevant to the application / Trial Design under consideration.
Establishing objectives leads to discussions of life safety solutions beyond those ‘deemed to satisfy’ life safety solutions into meaningful dialogue for assets, business criticality and management decisions for resourcing and training.
Through QDR, a wide range of stakeholders understand the interdependencies between design and operations, and where emphasis on safety is needed, with a broad input from a holistic range of knowledge, engagement is critical to use the resources available effectively.
The whole building life cycle (e.g. change control, product substitution, emerging information and handover) can all be appropriately interrogated through the QDR process to arrive at acceptable solutions to mitigate hazards.
Pessimistic collaboration
The QDR team should take account of the possibility of failures of protection systems and management procedures when establishing the sequences of events to be considered. In a deterministic or comparative study, it is usual to identify a number of worst-case scenarios for further evaluation.
BS-7974-0
A whole fire event can be modelled, with different fire locations, different protection solutions, different management responses, and may include firefighting operations.
Successful QDRs are workshops, not presentations; they are delivered by team effort, not by adversarial argument; they are constructive, not divisive; they are continual, not disjointed; they are visible, not obscurantist.
QDR provides a useful benchmarking exercise against code, regulations and other requirements and recommendations.
The QDR process is flexible and can be used from feasibility right through detail design, construction safety, operations, maintenance considerations and change of use/end of use and handover.
A whole fire event can be modelled, with different fire locations, different protection solutions, different management responses, and may include firefighting operations. |
This article originally appeared as ‘Building a safer future’, in Issue 128 of Architectural Technology Journal, published by The Chartered Institute of Architectural Technologists (CIAT) in Winter 2018-19. It was written by Dr Graham Smith MCIAT.
References:
- [1] Application of fire safety engineering principles to the design of buildings. Code of practice.
- [2] Fire safety in the design, management and use of buildings. Code of practice.
--CIAT
Related articles on Designing Buildings Wiki
Featured articles and news
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The remarkable story of a Highland architect.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.
A new CIOB TIS on discharging CDM 2015 duties
Practical steps that can be undertaken in the Management of Contractors to discharge the relevant CDM 2015 duties.
Planning for homes by transport hubs
Next steps for infrastructure following the updated NPPF.
Access, history and Ty unnos.
The world’s first publicly funded civic park.
Exploring permitted development rights for change of use
Discussing lesser known classes M, N, P, PA and L.
CIOB Art of Building photo contest 2024 winners
Fresco School by Roman Robroek and Once Upon a Pass by Liam Man.